Silent Generators
Acoustic canopies that keep the noise down where it matters: hospitals, CBD sites, residential streets and live events. The same power, a fraction of the sound.
Read MoreStart typing to find pages…
Containerised sets built for continuous heavy load. Units over 100kVA can be synchronised to run in series, giving you redundancy, load bearing and the ability to take a machine offline without dropping the site.
Industrial power is a different problem to site power. The load runs continuously, the starting currents are large, and an unplanned stop costs far more than the hire.
Above 100kVA the sets run in series, so the string keeps carrying the plant even with one unit offline.
That means load bearing, a spare machine already in the string, and the ability to pull one out for service without dropping production. Containerised sets, sized on the real load profile, with controls that hand over before anyone notices.
We have done it on hire and on permanent installations: four 550kVA sets synchronised with ComAp IG500 controls and field tanks at Barwon Water, two 770kVA sets with a new generator switchboard and ATS control at Brown Brothers, and two 1,500kVA super-silent sets with a 60,000L fuel system for the AusNet micro grid at Corryong.
Acoustic canopies that keep the noise down where it matters: hospitals, CBD sites, residential streets and live events. The same power, a fraction of the sound.
Read MoreNo triage queue and no handballing. The person who picks up is the person organising your set.
A real person on the phone any hour of any day, not an after-hours message bank. Tell us the site and what has gone down.
Our electricians and generator specialists work out what will carry the load now, and what the connection needs to look like.
The set goes out on our own float fleet, and our A-grade electricians make the connection and commission it on site.
Fuel management, monitoring and on-call technicians until your operation is back on, stable, and no longer needs us.

















Two or more sets are synchronised so they share the load as one supply. Above 100kVA our units can be run in series, which gives you redundancy if a machine drops out, the ability to carry a load bigger than any single set, and a way to take one offline for service without shutting the site down.
Yes. The industrial fleet is built for continuous duty, and we back it with monitored refuelling, remote monitoring and on-call technicians, so a long run does not depend on somebody remembering to check it.
Yes. We design and install ComAp IG500 and IG1000 control systems, generator switchboards, change-over gear and automatic transfer, and commission the lot. That work has gone into Barwon Water, Brown Brothers Winery, the AusNet micro grid at Corryong and a Defence installation in the Northern Territory.
With field tanks or industrial fuel cells sized to the run, up to 60,000L, and scheduled refuelling from our own trucks. On monitored contracts we track consumption and top up before it becomes your problem.
We hold hire stock in Kilsyth and run our own delivery fleet, including crane trucks for placement, so metropolitan deliveries are usually same day or next day. For an outage we are on call 24 hours per day, 7 days per week, and average a metro response under 90 minutes.
Yes, and we do it at scale. We hold maintenance and breakdown contracts covering large fleets of client-installed generators, including one covering more than 100 units for Yarra Valley Water and Ventia. Brand is not a barrier, we are vendor-agnostic.