Skip to content
Contact
Generator Hire

1100kVA Generator Hire

Bulk power for major industrial and infrastructure work: containerised sets, synchronised operation, designed temporary supply and fuel systems built to run for the length of the program.

A 1100kVA Caterpillar generator set available for hire from Eastern Generators
Continuous rating
1100 kVA
At 0.8 power factor
880 kW
Per phase at 415V
1530 A

Indicative figures at 0.8 power factor. The exact rating, outlets and dimensions are confirmed against the set we allocate.

What it runs

Bulk power, designed

A hire at 1100kVA is a temporary power station. Everything about it is designed: the placement, the controls, the fuel, and what happens when a machine has to come offline.

Major industrial sites, network infrastructure, large processing facilities and micro grids all sit in this band. The generator itself is the least complicated part of the job. The controls, the change-over arrangement, the cable route and the fuel storage are where the engineering lives.

Our large fleet is built around 1250kVA and 1500kVA machines, so an 1100kVA requirement goes out on the nearest set that carries the duty, or on synchronised sets designed around your load profile. We have delivered exactly this kind of work, including super-silent sets to network specification with ComAp controllers and a 60,000L fuel system.

  • A designed installation Controls, change-over gear, cable routes and fuel engineered as one system.
  • Synchronised sets Capacity and redundancy built from machines running in series under common control.
  • Proven at this scale Delivered on network, water and defence projects, not just quoted for.
Eastern Generators crew working at the tail of a transport truck
1100kVA Bulk power
On the job

Where an 1100kVA earns its keep

Major industrial sites, network and utility infrastructure, large processing facilities, micro grids, and defence and government projects.

Crew alongside a large containerised generator loaded on a flatbed
Containerised and delivered
A large hire generator being carried on a semi trailer
Heavy transport and placement
An Eastern Generators technician running earth cable to a large hire set
Earthing and connection
Crew checking the trailer under a large generator before a move
Planned lifts and moves
An Eastern Generators technician running services to a containerised set on site
Long-term site contracts
In the hire

It never goes out alone

A set on its own is rarely the whole job. The gear that gets it connected and keeps it running is held in our Kilsyth yard.

  • Refuelling trucks
  • Delivery tilt trays
  • Crane trucks
  • Industrial fuel cells
  • Temporary switchboards
  • Cable ramps and covers
  • Lighting towers
  • Load banks
What happens next

From your call to power on

No triage queue and no handballing. The person who picks up is the person organising your set.

  1. You call, we answer

    A real person on the phone any hour of any day, not an after-hours message bank. Tell us the site and what has gone down.

  2. We size it on the call

    Our electricians and generator specialists work out what will carry the load now, and what the connection needs to look like.

  3. Dispatch and connect

    The set goes out on our own float fleet, and our A-grade electricians make the connection and commission it on site.

  4. We stay accountable

    Fuel management, monitoring and on-call technicians until your operation is back on, stable, and no longer needs us.

Other sizes

Need more or less than 1100kVA?

The neighbouring sets in this part of the fleet. Each one has its own page with what it runs and what goes out with it.

Indicative figures. kW at 0.8 power factor, amps per phase at 415V three-phase.

The rest of the fleet

Need more than 1100kVA?

The hire fleet runs from 20kVA to 1500kVA, and sets can be synchronised to make the capacity a site needs. Tell us the load and we will design the arrangement.

Small
2080kVA

Small Generators

Events, concerts, retail stores, household backup. Ultra-quiet, drop-and-go.

  • Silent & portable
  • Single & three-phase
  • Same-day dispatch
Large
8001500kVA

Large Generators

Industrial plants, shopping centres, food processing. Bulk power, built to run.

  • Containerised units
  • Parallel-ready
  • Onsite commissioning
Trusted Across Victoria

Power for the projects that can’t go dark.

1100kVA questions

Frequently asked

What does an 1100kVA arrangement power?

A major industrial site, network or utility infrastructure under rebuild, a large processing facility, or a micro grid. At this scale the hire is a temporary power station and it is designed as one, with controls, change-over arrangements and fuel storage engineered together.

Do you hold a single 1100kVA set?

Our large hire fleet is built around 1250kVA and 1500kVA machines, so an 1100kVA requirement goes out on the nearest set that carries the duty, or on synchronised sets designed around your load profile. We tell you the arrangement when we quote.

Have you delivered work at this scale?

Yes. Our projects include supplying and installing super-silent generators with ComAp IG1000 controllers to network specification for AusNet Services in Corryong, together with a 60,000L fuel system for a micro grid, and synchronised sets with ComAp IG500 controls and field tanks for Barwon Water.

What does the control system do?

It synchronises the sets, shares load between them, and manages change-over so the site transfers cleanly. It is also how a machine is taken offline for service without the load noticing. We design, install and commission these arrangements in-house rather than subcontracting the controls.

How long does a hire this size take to mobilise?

Longer than a call-out, and the honest answer depends on the design. Placement, controls, switchgear and fuel all have to be worked out first. Bring us in early and the mobilisation is planned; bring us in late and we will still make it work, but the options narrow.

How is it commissioned?

Under real, measured load with our own load banks, including proving what happens when one set in a synchronised arrangement is taken offline. Comprehensive commissioning and testing is part of the job, not an optional extra.

1100kVA hire enquiries

Tell us what the operation has to carry

  • Replies within one business hour
  • 24 hours per day, 7 days per week
  • Hire, sales, servicing & installation
24/7 Power Hotline (03) 9739 0938

Free quote

Replies in < 1 hour