You call, we answer
A real person on the phone any hour of any day, not an after-hours message bank. Tell us the site and what has gone down.
Start typing to find pages…
The top of our hire fleet: containerised sets from 800kVA to 1500kVA for heavy industry, infrastructure and micro grids. Synchronised where a site needs more than one, and commissioned under real load by our own crew.
Four sizes at the top of the fleet. At this scale the generator is the smaller half of the job: the fuel system, the switching and the commissioning are the rest of it.
This band goes to plants and processing facilities, shopping centres, hospitals, network infrastructure and micro grids. The sets arrive containerised, are placed by crane, and are commissioned under real measured load rather than signed off against a nameplate.
It is almost always designed rather than delivered: synchronised sets for redundancy, temporary switchboards and change-over gear, and a fuel system sized to the length of the program, from field tanks up to 60,000L. Tell us what cannot go dark and for how long, and we will design the supply around it.
Pick the size, or tell us the load and the run time. At this scale we will usually want to walk the site before anything is quoted.
Heavy industrial: plants, processing, infrastructure.
800kVA hire 1100 kVABulk power with designed switching and fuel systems.
1100kVA hire 1250 kVAStandard or super-silent, containerised, synchronised.
1250kVA hire 1500 kVAThe largest set we hire, for what cannot go dark.
1500kVA hireIndicative figures at 0.8 power factor. The exact rating, outlets and dimensions are confirmed against the set we allocate.
Processing plants, shopping centres, network infrastructure and micro grids. Planned lifts, long-term site contracts, and the jobs that cannot go dark.
No triage queue and no handballing. The person who picks up is the person organising your set.
A real person on the phone any hour of any day, not an after-hours message bank. Tell us the site and what has gone down.
Our electricians and generator specialists work out what will carry the load now, and what the connection needs to look like.
The set goes out on our own float fleet, and our A-grade electricians make the connection and commission it on site.
Fuel management, monitoring and on-call technicians until your operation is back on, stable, and no longer needs us.
Below this band the workhorse fleet runs 100kVA to 500kVA, and the small band covers events, retail and site sheds from 20kVA up.
Small Events, concerts, retail stores, household backup. Ultra-quiet, drop-and-go.
Most Popular Construction sites, cranes, hotels and supermarkets. The workhorse of our hire fleet.

















At this scale the switchboard nameplate is usually a poor guide, so we work from measured demand: what the site actually draws, what the essential load is if you are prepared to shed the rest, and what steps on and in what order. The answer is often two smaller sets in parallel rather than one large one. Expect us to want to walk the site before quoting.
Yes. Synchronised operation is standard at this end of the fleet, and it is usually the reason a site chooses us. Running sets in series gives you redundancy if one faults, load sharing across the pair, and the ability to service one machine without the site going down.
Containerised, on heavy transport, and placed by crane. We inspect the access, the hardstand, the exhaust clearances and the airflow before delivery day, because at this size a placement problem found on the day is a lost day. Our own crane trucks and floats do the work.
With a designed fuel system rather than a jerry can and a schedule. Industrial fuel cells and field tanks, up to 60,000L systems, plus our own refuelling trucks on a scheduled program so a set running around the clock never comes close to dry.
Yes, under real measured load. We carry load banks for proof-of-capacity and commissioning tests, and our A-grade electricians handle the connection, the temporary switchboards and the change-over gear. Nothing is handed over on the strength of the rating plate.
Yes. We cover Melbourne and greater Victoria as a matter of course, and have run projects considerably further afield, including AusNet at Corryong and a Defence installation in the Northern Territory. Distance affects the timing and the logistics, not the service.